phase
|
stratum
|
sub-sr
|
definition of stratum
|
|
|
|
and of substratum
|
9p
|
10
|
|
Modern accumulations, backfill, current excavations
|
9m
|
20
|
|
Top soil
|
|
30
|
|
disturbed upper layer
|
|
40
|
|
|
9c
|
50
|
|
|
8r
|
60
|
|
Scattered use including tannurs
|
8m
|
70
|
|
Stones above second apron and scattered south, including isolated stones in J7
|
|
80
|
|
Layers just under stones of s70
|
7m
|
120
|
|
Accumulations above brickfall in J7
|
7e
|
150
|
|
Construction of second apron
|
|
155
|
|
Build-up and leveling with use areas on top of brickfall
|
|
158
|
|
Second phase of brickfall
|
|
159
|
|
Construction of small curtain walls inside brickfall and use areas
|
|
160
|
|
First phase of brickfall
|
|
161
|
|
Erosion
|
7d
|
170
|
|
Accumulations between revetment wall and curtain wall in k13
|
7a
|
171
|
|
First Mitanni deposits in J2, curtain wall in k13
|
5h
|
|
|
|
4r
|
|
|
|
4m
|
|
|
|
4c
|
550
|
|
Sloping accumulations forming upper levels at base of revetment wall
|
3s
|
610
|
|
Use floors against base of staircase and apron
|
3p
|
630
|
|
Building of western flanking wall (f127)
|
3m
|
650
|
|
Building the temple terrace, first floor and construction of monumental access
|
3l
|
660
|
|
Cut in SW corner of k100
|
|
665
|
|
Pebble floors associated with lower steps
|
3j
|
670
|
|
Floors with Ninevite 5 sherds
|
2h
|
850
|
|
Possible construction of early staircase f380
|